Delay analysis and performance evaluation of a guaranteed QoS provisioning mechanism for real-time traffic in IEEE 802.16e BWA systems

Der-Jiunn Deng, Chih Heng Ke, Yueh Min Huang, Hsiao Hwa Chen

研究成果: Conference contribution

1 引文 (Scopus)

摘要

Nowadays, multimedia applications are expected to be an important traffic source in wireless networks. Such sources usually have stringent delay requirements and in many cases they should be delivered exactly as they were generated. In this paper, we propose a novel polling based uplink packet scheduling policy for rtPS/ertPS (real-time Polling Service/extended real-time Polling Service) traffic to support real-time applications, with strict delay requirements, such as VBR (Variable Bit Rate) traffic in IEEE 802.16e BWA (Broadband Wireless Access) systems. The proposed transmit-permission policy can derive sufficient conditions such that all the rtPS/ertPS sources satisfy their time constraints to provide deterministic QoS (Quality of Service) guarantees. In addition to theoretical analysis, simulations are conducted to evaluate the performance of the proposed scheme. As it turns out, our design provides a good quality performance in the IEEE 802.16e BWA systems.

原文English
主出版物標題IWCMC 2008 - International Wireless Communications and Mobile Computing Conference
頁面326-331
頁數6
DOIs
出版狀態Published - 2008 十月 6
事件International Wireless Communications and Mobile Computing Conference, IWCMC 2008 - Crete, Greece
持續時間: 2008 八月 62008 八月 8

出版系列

名字IWCMC 2008 - International Wireless Communications and Mobile Computing Conference

Other

OtherInternational Wireless Communications and Mobile Computing Conference, IWCMC 2008
國家Greece
城市Crete
期間08-08-0608-08-08

指紋

Telecommunication traffic
Quality of service
Wireless networks
Scheduling

All Science Journal Classification (ASJC) codes

  • Computer Networks and Communications
  • Software
  • Electrical and Electronic Engineering

引用此文

Deng, D-J., Ke, C. H., Huang, Y. M., & Chen, H. H. (2008). Delay analysis and performance evaluation of a guaranteed QoS provisioning mechanism for real-time traffic in IEEE 802.16e BWA systems. 於 IWCMC 2008 - International Wireless Communications and Mobile Computing Conference (頁 326-331). [4599956] (IWCMC 2008 - International Wireless Communications and Mobile Computing Conference). https://doi.org/10.1109/IWCMC.2008.57
Deng, Der-Jiunn ; Ke, Chih Heng ; Huang, Yueh Min ; Chen, Hsiao Hwa. / Delay analysis and performance evaluation of a guaranteed QoS provisioning mechanism for real-time traffic in IEEE 802.16e BWA systems. IWCMC 2008 - International Wireless Communications and Mobile Computing Conference. 2008. 頁 326-331 (IWCMC 2008 - International Wireless Communications and Mobile Computing Conference).
@inproceedings{5afbbb40c4f94b2e8b2d320a7125940f,
title = "Delay analysis and performance evaluation of a guaranteed QoS provisioning mechanism for real-time traffic in IEEE 802.16e BWA systems",
abstract = "Nowadays, multimedia applications are expected to be an important traffic source in wireless networks. Such sources usually have stringent delay requirements and in many cases they should be delivered exactly as they were generated. In this paper, we propose a novel polling based uplink packet scheduling policy for rtPS/ertPS (real-time Polling Service/extended real-time Polling Service) traffic to support real-time applications, with strict delay requirements, such as VBR (Variable Bit Rate) traffic in IEEE 802.16e BWA (Broadband Wireless Access) systems. The proposed transmit-permission policy can derive sufficient conditions such that all the rtPS/ertPS sources satisfy their time constraints to provide deterministic QoS (Quality of Service) guarantees. In addition to theoretical analysis, simulations are conducted to evaluate the performance of the proposed scheme. As it turns out, our design provides a good quality performance in the IEEE 802.16e BWA systems.",
author = "Der-Jiunn Deng and Ke, {Chih Heng} and Huang, {Yueh Min} and Chen, {Hsiao Hwa}",
year = "2008",
month = "10",
day = "6",
doi = "10.1109/IWCMC.2008.57",
language = "English",
isbn = "9781424422029",
series = "IWCMC 2008 - International Wireless Communications and Mobile Computing Conference",
pages = "326--331",
booktitle = "IWCMC 2008 - International Wireless Communications and Mobile Computing Conference",

}

Deng, D-J, Ke, CH, Huang, YM & Chen, HH 2008, Delay analysis and performance evaluation of a guaranteed QoS provisioning mechanism for real-time traffic in IEEE 802.16e BWA systems. 於 IWCMC 2008 - International Wireless Communications and Mobile Computing Conference., 4599956, IWCMC 2008 - International Wireless Communications and Mobile Computing Conference, 頁 326-331, International Wireless Communications and Mobile Computing Conference, IWCMC 2008, Crete, Greece, 08-08-06. https://doi.org/10.1109/IWCMC.2008.57

Delay analysis and performance evaluation of a guaranteed QoS provisioning mechanism for real-time traffic in IEEE 802.16e BWA systems. / Deng, Der-Jiunn; Ke, Chih Heng; Huang, Yueh Min; Chen, Hsiao Hwa.

IWCMC 2008 - International Wireless Communications and Mobile Computing Conference. 2008. p. 326-331 4599956 (IWCMC 2008 - International Wireless Communications and Mobile Computing Conference).

研究成果: Conference contribution

TY - GEN

T1 - Delay analysis and performance evaluation of a guaranteed QoS provisioning mechanism for real-time traffic in IEEE 802.16e BWA systems

AU - Deng, Der-Jiunn

AU - Ke, Chih Heng

AU - Huang, Yueh Min

AU - Chen, Hsiao Hwa

PY - 2008/10/6

Y1 - 2008/10/6

N2 - Nowadays, multimedia applications are expected to be an important traffic source in wireless networks. Such sources usually have stringent delay requirements and in many cases they should be delivered exactly as they were generated. In this paper, we propose a novel polling based uplink packet scheduling policy for rtPS/ertPS (real-time Polling Service/extended real-time Polling Service) traffic to support real-time applications, with strict delay requirements, such as VBR (Variable Bit Rate) traffic in IEEE 802.16e BWA (Broadband Wireless Access) systems. The proposed transmit-permission policy can derive sufficient conditions such that all the rtPS/ertPS sources satisfy their time constraints to provide deterministic QoS (Quality of Service) guarantees. In addition to theoretical analysis, simulations are conducted to evaluate the performance of the proposed scheme. As it turns out, our design provides a good quality performance in the IEEE 802.16e BWA systems.

AB - Nowadays, multimedia applications are expected to be an important traffic source in wireless networks. Such sources usually have stringent delay requirements and in many cases they should be delivered exactly as they were generated. In this paper, we propose a novel polling based uplink packet scheduling policy for rtPS/ertPS (real-time Polling Service/extended real-time Polling Service) traffic to support real-time applications, with strict delay requirements, such as VBR (Variable Bit Rate) traffic in IEEE 802.16e BWA (Broadband Wireless Access) systems. The proposed transmit-permission policy can derive sufficient conditions such that all the rtPS/ertPS sources satisfy their time constraints to provide deterministic QoS (Quality of Service) guarantees. In addition to theoretical analysis, simulations are conducted to evaluate the performance of the proposed scheme. As it turns out, our design provides a good quality performance in the IEEE 802.16e BWA systems.

UR - http://www.scopus.com/inward/record.url?scp=52949126779&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=52949126779&partnerID=8YFLogxK

U2 - 10.1109/IWCMC.2008.57

DO - 10.1109/IWCMC.2008.57

M3 - Conference contribution

AN - SCOPUS:52949126779

SN - 9781424422029

T3 - IWCMC 2008 - International Wireless Communications and Mobile Computing Conference

SP - 326

EP - 331

BT - IWCMC 2008 - International Wireless Communications and Mobile Computing Conference

ER -

Deng D-J, Ke CH, Huang YM, Chen HH. Delay analysis and performance evaluation of a guaranteed QoS provisioning mechanism for real-time traffic in IEEE 802.16e BWA systems. 於 IWCMC 2008 - International Wireless Communications and Mobile Computing Conference. 2008. p. 326-331. 4599956. (IWCMC 2008 - International Wireless Communications and Mobile Computing Conference). https://doi.org/10.1109/IWCMC.2008.57