Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework

Singa Wang Chiu, Fan Yun Pai, Wen Kuei Wu

研究成果: Article

9 引文 斯高帕斯(Scopus)

摘要

This study employs an alternative approach to determine common production cycle time for a multi-item production system with discontinuous deliveries and failure in rework. A straightforward approach using algebraic derivation is proposed here to reexamine a specific common cycle time problem studied by Chiu et al. (2013a,b), where they used the conventional method with the need of applying first-order and second-order differentiations to system cost function for proof of convexity before deriving the optimal common cycle time. The result of this study is confirmed to be identical to that was obtained in Chiu et al. (2013a,b). This alternative approach enables practitioners who may not have sufficient knowledge of differential calculus to manage the real-life multi-item production systems more effectively.

原文English
頁(從 - 到)593-596
頁數4
期刊Economic Modelling
35
DOIs
出版狀態Published - 2013 九月 1

All Science Journal Classification (ASJC) codes

  • Economics and Econometrics

指紋 深入研究「Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework」主題。共同形成了獨特的指紋。

  • 引用此