@inproceedings{5d2160db28d44f47a5410d6d9bfce963,
title = "A new approach to determine the critical path in stochastic activity network",
abstract = "The determination of the Critical Path (CP) in stochastic networks has being a hard work, it is because of path durations are random variables and the selection of the critical path in the network causes probability problems. In this study, the authors have given a new definition on the CP in stochastic network and developed a modified Label-Correcting Tracing Algorithm (LCTA) to solve it. Based on the numerical results, as compared with Monte Carlo Simulation (MCS), it is proved that the proposed approach can accurately solve the CP in stochastic networks.",
author = "Chu, {Eng Ming} and Chang, {Koan Yuh} and Chien-Yu Lu and Hsu, {Chang Hung} and Liu, {Chien Hung} and Hsiao, {Yung Chia}",
year = "2014",
month = jan,
day = "1",
doi = "10.1109/IS3C.2014.292",
language = "English",
isbn = "9781479952779",
series = "Proceedings - 2014 International Symposium on Computer, Consumer and Control, IS3C 2014",
publisher = "IEEE Computer Society",
pages = "1123--1128",
booktitle = "Proceedings - 2014 International Symposium on Computer, Consumer and Control, IS3C 2014",
address = "United States",
note = "2nd International Symposium on Computer, Consumer and Control, IS3C 2014 ; Conference date: 10-06-2014 Through 12-06-2014",
}